FACTORY ENVIRONMENTAL CLAIMS: SEPARATE WASTE, ENERGY, AND EMISSIONS Editable planning/verification record — Yenra Updated: October 2, 2026 Article: https://yenra.com/zero-emissions-manufacturing-facility/ Purpose: Identify the boundary, denominator, period, and evidence behind a waste-diversion or emissions claim and prepare separate records for each. Intended reader: Plant managers, sustainability staff, and readers evaluating factory claims HOW TO USE Save a working copy. Enter the actual specification, units, assumptions and evidence references in each field. Preserve original observations and record changes. Have the responsible reviewer resolve missing or conflicting requirements before release. Examples below are fictional teaching inputs, not process settings or acceptance standards. RECORD 1. Exact claim wording, intended audience and reviewer: ____________________________________________________________ 2. Site/organizational boundary, included/excluded operations, period: ____________________________________________________________ 3. Accounting or certification scheme and version: ____________________________________________________________ 4. Waste stream, mass in metric tonnes, source ticket, destination and verified treatment: ____________________________________________________________ 5. Declared numerator/denominator and treatment of rejects/incineration: ____________________________________________________________ 6. Energy activity, original unit, converted unit, meter and period: ____________________________________________________________ 7. GHG source, scope, activity, factor/unit/version and result in tonnes CO2e: ____________________________________________________________ 8. Location/market-based method and contractual evidence where applicable: ____________________________________________________________ 9. Absolute totals, production denominator, intensity and comparison period: ____________________________________________________________ 10. Missing data, estimates, uncertainty, approval and maintenance trigger: ____________________________________________________________ WORKED EXAMPLE AND LIMITS Fictional examples: waste 84 recycled + 6 reused + 4 composted + 3 incinerated + 3 landfilled = 100 tonnes. Defined diversion 94%; recycling 84%. Energy 20,000 kWh x invented 0.30 kg CO2e/kWh = 6 tonnes CO2e. Intensity 100,000/10,000 = 10 kWh/unit versus 110,000/12,500 = 8.8; intensity down 12%, absolute use up 10%. No example proves certification or a complete emissions inventory. REVIEW Prepared by / date: ____________________ Reviewed by / date: ____________________ Open issues, responsible owner, due date: ____________________ Approved next action and evidence: ____________________ SOURCE CONTEXT These primary references support the linked article. Use exact applicable product, contract, and document versions for operational work. waste tracking guide for commercial buildings https://www.epa.gov/smm/managing-and-reducing-wastes-guide-commercial-buildings TRUE certification requirements https://true.gbci.org/true-certification-zero-waste GHG Protocol Corporate Standard https://ghgprotocol.org/corporate-standard Scope 2 Guidance https://ghgprotocol.org/scope-2-guidance Return to the guide: https://yenra.com/zero-emissions-manufacturing-facility/