WLAN REQUIREMENTS AND PILOT SCORECARD Companion guide: https://yenra.com/wlan-vendors/ Prepared September 8, 2026. Editable planning aid; no vendor ranking. Organization/site/date: Decision owner / technical owner: Candidate, exact SKUs, firmware and management arrangement: Required rooms, busiest user count, client models and applications: Pilot topology, placement, configuration and upstream service: Differences from planned production: MANDATORY GATES - define expected results before comparing suppliers. For each: requirement; test method; expected result; actual result; evidence location; pass/fail/pending; owner and corrective action. Client/application compatibility: Guest/staff isolation and authentication: Power/backhaul compatibility: Administration, recovery and account ownership: Support lifetime and required service continuity: Additional mandatory requirement: Any failed/pending mandatory gate requires resolution before acceptance. PILOT TESTS - repeat equivalent conditions for each candidate. Fresh join and real application task: Busy-period workload: Movement between required locations: Sleep/wake: Authorized planned interruption and supported recovery: Limited administrator role, diagnostics and configuration export: Evidence should identify devices, locations, timestamps and all attempts. OPTIONAL WEIGHTED PREFERENCES - use only after mandatory gates pass. Agree weights first; total must equal 100. Score from 0 to 5 against written criteria (0 = fails defined preference, 5 = fully meets it). Untested means pending, not an invented numeric score. Criterion / weight / score / observation and evidence: Client experience: Operations: Lifecycle cost: Exit readiness: Total = sum(weight multiplied by score) divided by 5; maximum 100. Fictional example: weights 40,25,20,15; scores 4,3,5,2. (160+75+100+30)/5 = 73/100. These are not product test results. COST COMPARISON - same ownership period, currency and scope. Quote date / currency / period: Hardware and mounting: Switching, power and other dependencies: Installation / training / support: Subscriptions / renewals / replacement: Taxes, exclusions and growth assumptions: Expiry behavior and support-end evidence: Exit/export/device-release terms: Decision, remaining exceptions, acceptance owner and retest plan: Source documents: retain exact supplier terms and manuals; the companion guide links example licensing/control-plane documents and related tests.