WIRELESS SENSOR MONITORING PILOT Companion: https://yenra.com/wireless-sensor-networks/ Prepared September 8, 2026. For non-safety-critical monitoring planning. INSTRUCTIONS Define measurement and delivery requirements first. Count unique reports using an explicit sensor/report identity. Separate missing, late, duplicate and buffered records. Use real measurement time when available; label receipt-time-only data. Owner / operator / period and timezone: Quantity / unit / range / required accuracy / reference or calibration evidence: Sensor IDs / locations / models / firmware: Gateway and application models/versions/interfaces: Sampling interval / reporting interval / aggregation behavior: Maximum permitted data age and deadline definition: Timestamp source / clock synchronization / uncertainty: Expected reports and treatment of startup or planned downtime: Unique received reports: Unique received reports that missed the deadline: Duplicates / out-of-order / buffered replay counts: Longest gap and worst sensor: Completeness = unique received / expected x 100: Timely completeness = (unique received - late) / expected x 100: FICTIONAL ARITHMETIC CHECK 3 sensors x 60 reports/hour x 24 hours = 4,320 expected. 4,276 unique received: completeness = 98.98% (rounded to two decimals). 40 of those received are late: 4,236 / 4,320 = 98.06% timely completeness. These are teaching values and not acceptance thresholds. FAILURE AND ALERT TESTS ON AN APPROVED BENCH Sensor reporting interruption / quality flag / data age / alert: Gateway or Ethernet interruption / stored readings / application behavior: Recovery time / original measurement timestamps preserved / duplicate handling: Harmless test alert / recipient / acknowledgement / action: POWER AND MAINTENANCE Usable battery capacity (mAh), source and conditions: Measured whole-device average current (mA) and workload: Idealized hours = mAh / mA; days = hours / 24: Fictional check: 2,000 mAh / 0.20 mA = 10,000 hours = about 417 days. Temperature, aging, self-discharge, voltage limits and maintenance margin: Battery / calibration / firmware / retention / alert owners: Acceptance decision / exceptions / action owner / next trigger: NIST AMS 300-4, linked in the companion guide, provides deployment context.