Wind-project operating evidence record Yenra | Updated October 1, 2026 Article: https://yenra.com/wind-energy-power-generation/ Purpose: connect a named project's recorded output with its equipment, delivery limit and dated forecasts. Keep adjacent facilities distinct. 1. Identity: plant name/code ____ generator IDs ____ owner/year ____ Source file/version/date ____ EIA-860 record ____ EIA-923 record ____ 2. Annual record (one line per consistent equipment configuration). Year | Net generation MWh | Chosen rating MW | Hours | Capacity factor ____ | __________________ | ________________ | _____ | _______________ Rating basis: nameplate, capability or delivery limit? ____ Leap year? ____ Mid-year capacity changes? ____ Repowering/equipment dates and documents: ____ 3. Capacity factor = net generation MWh / (constant rating MW x hours). For changing ratings, use a documented capacity-time denominator and explain the method; do not silently use the final year's rating. 4. Separate fields for forecast generation, measured generation, shared interconnection limits, curtailment, outages and wind conditions: ____ 5. Local-benefit claim: forecast ____ dated payment evidence ____ Emissions claim: system baseline/method ____ unresolved evidence ____ FICTIONAL EXAMPLE: 600,000 MWh / (200 MW x 8,760 h) = 34.2% rounded. At a stated 10 MWh per household-year, the energy equivalence is 60,000 household-years. Continuous service requires adequate supply at each hour. Source context: the article compares PNM's 2023 IRP and 2026 plan testimony. They date repowering differently (2019 versus 2018); resolve project milestones before assigning a precise commissioning date. Data: https://www.eia.gov/electricity/data/eia860/ https://www.eia.gov/electricity/data/eia923/