ROLLING STEEL DOOR: SELECTION AND HANDOVER BRIEF Yenra | Updated September 17, 2026 Guide: https://yenra.com/wiki/Rolling_steel_door/ Purpose: prepare consistent requirements for supplier quotations and record unresolved items. Save one copy per opening. Enter "unknown" where needed; assign a person to verify it before an order is released. Owner observations are preliminary. Have the supplier verify dimensions and a qualified design professional resolve mounting, structural and applicable code requirements. This is a planning record, not installation, repair or fire-door testing instructions. 1. PROJECT AND OPENING Building/address and jurisdiction: Opening ID/location: Owner/contact/date: Reason for project (condition, traffic, security, exposure, other): Existing door and operator model/serial numbers: Documents/manual revisions available: Required door family (service, insulated, fire, counter, grille): If fire protection is required, responsible designer/authority and documentation: State dimensions in ONE unit system (mm or inches): Preliminary clear opening width / height: Available headroom / side room: Wall/support construction and mounting face: Ceiling, pipes, cable trays or other clashes: Floor/threshold observations: Dimension verification by/date: Support/attachment design by/date: 2. ACTUAL USE Observation dates and representative shifts: Cycle definition used (e.g. closed -> fully open -> closed): Complete cycles/day: Operating days/year: Estimated cycles/year = cycles/day x operating days/year: Busiest hour: cycles and time period: Consecutive operation / dwell time / time held open: Vehicles, queues and separate pedestrian access: Expected future use changes: Control/access method and supervision: Alarm/dock interfaces and responsible parties: Required power-loss arrangements to confirm with supplier: Fictional example from guide: 80 cycles/day x 250 days/year = 20,000 cycles/year; 40 cycles in the busiest hour. Submit both daily and peak demand. Annual cycles describe workload; they do not predict door life or warranty coverage. 3. PROPOSAL COMPARISON (repeat for each supplier) Supplier / quotation date / validity / currency: Exact model, size, slats, finish, operator and options: Dimensioned drawing and mounting/support evidence: Duty limits, cycle definition and manufacturer confirmation for our workload: Opening/closing speed and control assumptions: Required positive/negative wind design pressure, units and designer: Offered rating and matching configuration/document: Thermal value, units, method and component/whole-door scope: Separate air-leakage evidence, if needed: Controls/protective devices and compatibility documentation: Fire label/listing and closing-system requirements, if applicable: Installation, commissioning, training and acceptance responsibilities: Maintenance schedule, parts route and service response: Warranty scope, start date, labor and exclusions: Supply / installation / related trade / scheduled service / callout costs: Downtime assumptions and arrangements: Each requirement: confirmed / excluded / awaiting verification: Open issue -> evidence needed -> person responsible -> due date: 4. HANDOVER AND SERVICE RECORD Installed door/operator identifiers and approved drawings: Manuals, owner checks and technician-only tasks: Installer commissioning/protective-device records: Required authority sign-off: Operating instruction and fault-reporting contact: Service contract, next inspection and applicable fire-door test date: Outstanding item / person / due date / closure evidence: Repeat log entry: Date/time / observed issue or damage / action taken / service reference / technician findings / return-to-service record where applicable: Do not adjust springs, tension wheels or counterbalance assemblies yourself. Use manufacturer instructions and trained door-system service providers. SOURCE CONTEXT DASMA TDS 270 (June 2021 revision): maintenance responsibilities and warnings https://www.dasma.com/wp-content/uploads/2021/08/TDS270.pdf DASMA TDS 271 (June 2025 revision): rolling steel fire-door inspection/testing https://www.dasma.com/wp-content/uploads/2026/01/TDS271.pdf DASMA current document index (check for revisions) https://www.dasma.com/technical-data-sheets/ Project-specific ratings, manuals and local requirements control the final brief.