CLEAN ENERGY COMPARISON AND SENSITIVITY WORKSHEET Yenra | Updated September 7, 2026 Article: https://yenra.com/wiki/Best_clean_energy/ PURPOSE Compare eligible energy proposals for a stated service. Preserve raw evidence, units, source dates and uncertainty. Use weights only after checking essential requirements. This worksheet is a decision aid, not a universal technology ranking. SERVICE AND ELIGIBILITY Location and delivery point: Required service (electricity, heat or other): Annual energy and units: Critical hours / peak requirement / reliability requirement: Decision period and required delivery date: Existing grid, generation, storage and flexible loads: Land, water, permitting and other essential constraints: Option A and eligibility evidence: Option B and eligibility evidence: Unresolved requirements and responsible person: EVIDENCE (repeat for each option) Lifecycle greenhouse gases per unit of delivered service: Study boundary, lifetime and capacity factor: Air pollutants, location and affected populations: Land and ecosystem impacts: Water withdrawal and water consumption separately: Materials, waste and available recovery route: Cost, currency year, financing and included/excluded items: Connection, balancing, replacement and decommissioning provisions: Contribution during relevant demand/stress periods: Source / edition / date / uncertainty for each field: WEIGHTED COMPARISON Define scoring anchors before assigning scores (for example 1 to 5, with 5 preferred). Retain underlying measured or estimated values. Criterion / weight / A score / B score / supporting evidence: Weights must sum to 1 (or 100%). Weighted score = sum of score x weight over all criteria. Essential requirements remain separate from preference scoring. FICTIONAL EXAMPLE Criteria: climate, cost, delivery time. A scores 5, 3, 2. B scores 3, 4, 5. Weights .50, .30, .20: A = 3.8; B = 3.7. Weights .30, .30, .40: A = 3.2; B = 4.1. These invented scores describe no named technology. The changed preference shows sensitivity to the chosen priorities. Do not treat a small score difference as decisive when inputs overlap. SENSITIVITY AND DECISION Alternative plausible weights: Lower-performance or higher-cost cases: Does the preferred option change? Which uncertainty could change eligibility or the recommendation? Who chose the weights and why: Decision / tradeoffs / unresolved evidence: Next evidence to obtain and assigned owner: Trigger for reassessment: Keep generation-only metrics distinct from the cost and impacts of delivering the complete required service. REFERENCE CONTEXT The linked article explains the comparisons and limits. Check exact project or equipment documents before using a specification. IPCC’s 2022 assessment of energy systems https://www.ipcc.ch/report/ar6/wg3/chapter/chapter-6/ EIA’s 2022 explanation of levelized electricity costs and value https://www.eia.gov/outlooks/aeo/electricity_generation.php