WEARABLE-COMPUTER EVALUATION NOTES Yenra | https://yenra.com/wearable-computers-for-the-military/ Prepared September 10, 2026. A comparison worksheet for an authorized, harmless training task. Follow the applicable equipment, information, and technical-publication requirements. DEFINE THE TASK Reader/user and starting knowledge: Task (for example, identify labeled parts on a training mock-up and find the matching approved reference illustration): Current baseline method: Information source, equipment version, and reference revision: Success criteria and scoring method: RECORD THE COMPLETE CONFIGURATION Display/headset, processor, sensors, radio, batteries, cables, and accessories: Software/content versions: Full worn/carried mass, if measured, with units: Lighting, noise, movement, gloves, other worn equipment: Local content available offline: Remote support and connectivity needed: What data is collected, where stored, who can access it, and how it is managed: ENERGY ESTIMATE Nominal energy (Wh): Assumed usable fraction, with reason: Usable energy (Wh) = nominal Wh x usable fraction. Assumed or measured average system power (W): Simple estimated runtime (hours) = usable Wh / average W. List devices included and excluded from the power measurement: Temperature, battery age, workload, test end condition: Observed runtime and difference from estimate: FICTIONAL EXAMPLE 24 Wh nominal energy, an illustrative 25 percent reserve, 6 W average draw. 24 x 0.75 = 18 Wh usable; 18 / 6 = 3 hours. At 9 W, 18 / 9 = 2 hours. These are invented inputs. The reserve is not a policy requirement. The calculation is a first-order estimate, not a product rating; validate representative measured performance. COMPARE THE RESULT WITH THE BASELINE Information-lookup time: Complete-task time: Errors / help requests / discomfort: What was easier or harder, and why: Later unaided assessment, if the objective includes learning: Remaining uncertainty and evidence needed: SOURCE CONTEXT The companion article cites the Army's April 2026 maintenance demonstration and NIST SP 800-124 Revision 2. The demonstration illustrates workflows; the NIST document provides general mobile-device lifecycle questions. Neither authorizes a particular device or supplies the fictional example's power values. https://www.army.mil/article/292095/augmented_reality_transforms_army_maintenance_and_training https://csrc.nist.gov/pubs/sp/800/124/r2/final