YENRA - STORAGE SERVICE AND CAPACITY REVIEW Source guide: https://yenra.com/utility-storage-management/ Prepared September 10, 2026. Save a copy and fill with a text editor. Use one record per service/pool; use the same units and observation date. Service / pool / owner: ________________________ Measurement date and period: ___________________ Units: decimal GB/TB or binary GiB/TiB? _________ Data source / dashboard / query: _______________ Application and environment: __________________ CAPACITY Logical capacity presented to applications: ____ Usable physical pool capacity after overhead: __ Measured physical consumption: ________________ Planning threshold and rationale: _____________ Headroom to threshold = threshold - consumption: _______________________________________________ Observed net growth per month: _________________ Additional planned net growth per month: _______ Total assumed net monthly growth: ______________ Months to threshold = headroom / total growth: _ If growth is zero/negative, do not divide; describe the trend and scenario. Purchase/migration/test lead time: ______________ Required contingency time: _____________________ Action date and owner: _________________________ FICTIONAL EXAMPLE - not a universal threshold Usable pool 100 TB; consumed 62 TB; chosen threshold 80 TB. Headroom 80 - 62 = 18 TB. At 3 TB/month net growth: 18 / 3 = 6 months to threshold. With another 2 TB/month planned: 18 / (3+2) = 3.6 months. Assumes linear growth and a consistent physical-capacity boundary. Review snapshot, replication, compression, reclamation, and reserved-space behavior. Verify unusual changes before extrapolating them. SERVICE AND RECOVERY Latency / throughput / IOPS expectations: _______ Retention and deletion approval owner: _________ Recovery point objective (data loss in time): ___ Recovery time objective (time to usable service): _______________________________________________ Last restore test / dataset / isolated location: _______________________________________________ Recovered point and observed data age: _________ Full time including restore and validation: ____ Application integrity result / evidence: _______ Key and configuration access verified? _________ Outstanding recovery action: ___________________ COST ALLOCATION Period, currency, and included shared costs: ____ Basis (average consumption, reservation, tier...): _______________________________________________ Measurement method and sources: ________________ Team quantities / total / allocated amounts: ___ Reconciliation: allocations sum to included cost? _______________________________________________ Fictional example: $1,200 shared monthly cost; A=6 TB and B=4 TB average consumption. A=6/10 x $1,200=$720; B=4/10 x $1,200=$480. This internal allocation rule can differ from provider invoice meters. DECISION Capacity action / recovery action / owner / due date: _______________________________________________ Next review or change trigger: _________________