Universal content management integration acceptance checklist Guide: https://yenra.com/universal-content-management/ Updated October 4, 2026. Use the same sample and rules for each architecture. SCOPE AND OWNERS Candidate architecture / exact product and connector versions / test date: Authoring owner / editable-master source of truth: Publishing owner / release-state source of truth: Asset owner / reuse-rights source of truth: Records owner / declaration and retention-policy references: Connector operational owners / escalation and repair route: Sample master ID / revision / approved rendition / asset references: Destination IDs / retained record ID / mapping evidence: ACCEPTANCE RULES (set before the demonstration) Allowed and denied roles / permission propagation deadline: Required metadata and transformation rules: Maximum page/cache/search delay / measurement method: Publication dependency on records capture / approved exception process: Removal rules for page, asset, source and retained record: TEST RECORD (repeat for each test below) Test ID / expected result / action / observed result / pass-fail-unverified: Start and finish times / source and destination versions / evidence location: Exception / accountable owner / due date / retest: TESTS 1 Publish revision 3; then revision 4. Retrieve each intended destination. 2 Remove editor access. Test search and direct restricted URLs per role. 3 Compare owner, language, approval and asset-reference fields, including nulls. 4 Measure an approved change reaching the page, caches and search. 5 Interrupt a connector, inspect the visible error and owner, then retry. 6 Replay the same event. Verify one intended resulting release/record. 7 Simulate website success with records-capture failure. Check agreed policy. 8 Unpublish/withdraw an item. Verify each required downstream action. 9 Export files, fields, assets and relationships. Open and reconcile package. DECISION Demonstrated capabilities / unresolved failures / unverified claims: Detection and repair effort / exit-package gaps / owners and next action: Acceptance decision / accountable owner / evidence / date: