VERTICAL TURBINE PUMP REPLACEMENT BRIEF Edition: October 3, 2026 Guide: https://yenra.com/turbine-pumps/ Purpose: collect the information a qualified supplier or engineer needs to review a replacement. This is a record, not a sizing or installation procedure. Use existing records and measurements obtained under approved procedures. Do not enter a wet well, remove guards or open electrical equipment to fill it. Write UNKNOWN where evidence is missing. Attach supporting drawings and data. FACILITY AND RESPONSIBILITY Facility / pump asset ID: Prepared by / date / contact: Responsible engineer or supplier / review date: Service to maintain / allowed outage / approved standby arrangements: INSTALLED EQUIPMENT Manufacturer / model / serial number: Nameplate and general-arrangement drawing filenames / revisions: Certified curve / impeller configuration / stage count: Column setting length / units / drawing reference: Outlet flange and orientation / mounting and access constraints: Driver power / units / voltage / phase / frequency / speed: Shaft / bearings / lubrication / thrust arrangement (document reference): REQUIRED AND MEASURED DUTY (include units with every value) Required flow: minimum / normal / maximum: Required head at each flow / calculation reference: Measured flow and head / date / speed / valve and control conditions: Source liquid levels: minimum / normal / maximum / stated reference: Destination level or pressure / stated reference: Liquid composition / temperature range / solids / available analysis: Intake geometry / inlet-condition and submergence review reference: Suction margin review by engineer or supplier / unresolved issues: CONDITION AND CONTINUITY Recent alarms / performance, vibration and leakage records: Inspection findings / report dates: Existing spares / compatibility confirmed by: Supplier scope / exclusions / confirmed delivery basis: Installation and commissioning responsibility: Acceptance criteria and required records: OPEN ITEMS (repeat for each unresolved question) Question: Evidence required: Owner / due date: Resolution / supporting document / reviewer: ILLUSTRATIVE HEAD EXAMPLE -- NOT A DESIGN Two open tanks: elevation difference 18 m; losses at target flow 7 m. Ignoring velocity differences: required head = 18 + 7 = 25 m. If source level falls 3 m, head becomes 28 m at the same flow/assumed losses. Real selection also requires the complete curve, operating range, inlet conditions, liquid properties, mechanical fit and qualified review. SOURCES AND HOW TO USE THEM DOE Pump Selection Considerations (October 2005): https://www.energy.gov/sites/prod/files/2014/05/f16/pump_selection.pdf DOE Match Pumps to System Requirements (October 2005): https://www.energy.gov/sites/prod/files/2014/05/f16/match_pumps_to_system.pdf Flowserve VTP/VPC instructions, 71569224 EN (manufacturer example): https://flowserve.widen.net/content/nr0i1vcrwv/pdf/71569224_EN_AQ.pdf?t.download=true Use the current manual and order-specific drawings for the actual equipment. Keep the reviewed brief and supporting files with the procurement record.