Yenra original reusable resource — September 6, 2026 Remote-control personnel-platform readiness record Planning record only, not certification, operating instructions or a substitute for the approved manufacturer inspection checklist. No compatibility is established by a pendant or platform being present. Job, work area and responsible supervisor: Jurisdiction and applicable requirements checked: Machine model/serial number: Platform model/serial/attachment ID: Remote model/ID and specified software/configuration: Manufacturer approval evidence for this exact combination: Manuals/supplements and revisions: Personnel/materials/tools load and applicable platform limit source: Ground, setup, clearance, weather and access assessment: Control station/mode selection and enabled functions: Command-release behavior and manual reference: Signal-loss and low-battery response and recovery reference: Emergency-stop functions and locations: Inspection and approved function-test results: Trained/familiarized operator and supporting personnel: Site communications and work-area control: Manufacturer emergency procedure and site rescue plan reference: Power-failure/incapacitated-operator recovery arrangements: Required people and equipment available throughout job: Fall-protection requirements and manual/site reference: Fault resolution and authorized return-to-service record: Review after machine/platform/control/mode/site change: Unresolved issues (resolve before personnel use):