Satellite link planning and acceptance record Yenra | Updated September 28, 2026 Guide: https://yenra.com/satellite-communications/ Purpose: Define the work the connection must support before ordering. Site / coordinates / country: Fixed or mobile use: Application / hours / concurrent users: Minimum acceptable task result / maximum interruption: Provider / plan / terminal / firmware: Coverage and obstruction evidence / date: Installation owner / approved manual: Terminal + router + switch + Wi-Fi power loads: Backup power runtime measured: Public addressing / VPN / remote management requirements: Test date / local time / test endpoint / wired or Wi-Fi: Download Mbps / upload Mbps / round-trip latency ms / packet loss %: Actual application outcome under typical load: Primary-link withdrawal method / approval / test window: Recovery seconds / sessions lost / DNS / VPN / authentication outcome: Failback result: Shared failure points: Support contacts stored offline / recovery owner: Decision / unresolved item / next check: Instructions: Log several representative tests. Record observed results separately from advertised service figures. This is a planning record, not installation instructions. Follow the chosen terminal manual and provider commissioning process. Source context: This worksheet accompanies the linked guide and its primary-source references.