FLOOD-BARRIER SELECTION WORKSHEET - YENRA Guide: https://yenra.com/sandless-sandbag/ Worksheet edition: September 10, 2026 Complete in safe conditions before purchase or deployment. Duplicate the candidate section for each product. Unanswered questions remain unresolved; this worksheet does not approve a barrier or provide engineering dimensions. Follow evacuation orders and current local instructions. PROPERTY QUESTION Water source (rain, river, coastal, sewer, other/unknown): Observed entry pathway and date: Photos/sketch: Opening/surface shape, slope and irregularities: Possible bypass routes: Outcome wanted: Questions requiring a qualified local professional: CANDIDATE PRODUCT Manufacturer / exact model: Manual revision and URL / date checked: Water compatibility and exclusions: Activation method and conditions: Specified timing and available preparation time: Dry and activated handling requirements: Allowed orientation, surface and configurations: Documented leakage or seepage limits: Performance claim / test method / tested configuration: Certification scope and supporting document, if claimed: Differences between test conditions and this property: Safe deployment access and who will carry it: Rehearsal permitted by manual / result: Storage conditions and stated shelf life: Meaning and limits of reuse: Contaminated-material disposal contact and instructions: Replacement requirements: Unresolved questions / person to ask / response: DECISION RECORD Product considered suitable for which documented use: Remaining limits and alternative measures: Local warning source and evacuation instructions to follow: Date / responsible person: Source context: product-specific manufacturer instructions, NWS flood guidance and local authorities. Supporting links are in the guide.