YENRA FLOOR-HEATING PLANNER Guide: https://yenra.com/radiant-floor-heat/ Prepared: September 11, 2026 Use: Save and edit this brief with your installer. This is a planning and calculation aid; installation follows the exact system's current manual. PROJECT Room / date / designer or installer: Purpose: floor comfort / primary heating with a heat-loss design Room area and units: Actual heatable area and units: Fixed fixtures / excluded areas / layout drawing: System / model / manual revision: Electric voltage and rated power, or hydronic heat source: Qualified professional confirming capacity and controls: ASSEMBLY (STRUCTURE TO FINISH) Subfloor: Preparation / leveling: Insulation if specified: Heating layer: Bonding / encapsulation: Waterproofing if required: Finish / adhesive / written compatibility: Resulting floor height and transitions: Approved operating limits / rugs or furniture restrictions: ELECTRIC RESISTANCE-HEATING SCENARIO Use one currency throughout. This is an energy-charge estimate only. P = total installed heating power in watts: ______ H = enabled schedule in hours/day: ______ D = number of days: ______ F = assumed energized fraction from 0 to 1: ______ R = electricity energy rate in currency/kWh: ______ Reason for F / measured information if available: ______ Energy (kWh) = (P / 1000) x H x D x F Energy charge = energy x R Full-power scheduled scenario uses F = 1. An enabled thermostat schedule is different from actual energized time. This excludes other bill charges and changes to other heating use. Hydronic costs need a separate heat-source and distribution calculation. WORKED EXAMPLE (INVENTED ASSUMPTIONS) P=600 W; H=6 hours/day; D=30 days; F=0.50; R=$0.20/kWh. 0.600 x 6 x 30 x 0.50 = 54 kWh. 54 x $0.20 = $10.80. At F=1 over the same schedule: 108 kWh and $21.60. The 50% fraction is a scenario assumption, not typical performance. HANDOVER Approved layout / photos before covering: Manufacturer-required test records and stages: Sensor / circuit or loop identification: Controls demonstration / settings: Cure period and permitted startup date: Inspection acceptance / warranty / service contact: SOURCE CONTEXT Schluter DITRA-HEAT documents, a system-specific example: https://www.schluter.com/schluter-us/en_US/Floor-Warming/Schluter%C2%AE-DITRA-HEAT/p/DITRA_HEAT DOE 2014 heat-source overview (principles, not current product selection): https://www.energy.gov/sites/default/files/2014/01/f6/homeHeating.pdf