YENRA PREFABRICATED FACADE COORDINATION BRIEF Guide: https://yenra.com/prefabricated-architectural-facades/ Prepared: September 11, 2026 Use: Complete with the owner, designers, manufacturer and site trades. Duplicate the interface entry for each transition. Name responsible parties and document revisions. This is a coordination aid, not an engineering, connection, lifting or erection procedure. PROJECT BASIS Project / location / date: Architect / structural engineer / enclosure specialist: Supplier / installer / general contractor: Structural function of facade: Panel geometry / governing drawing: Performance brief and applicable requirements: Factory-included layers and components: Site-completed scope: INTERFACES TO REVIEW Panel to structure; panel to panel; window to panel; roof/parapet; base/foundation; floor edge; corners; movement joints; penetrations. REPEAT THIS RECORD FOR EACH INTERFACE Interface and unresolved question: Decision owner / deadline: Designer / installer / reviewer: Governing drawing and revision: Loads, movement and tolerance criteria (units and source): Air / water / thermal / acoustic / fire-related continuity: Material compatibility evidence: Factory work: Site work: Inspection access / acceptance test or evidence: Approved decision / date / revision: MOCKUP AND RELEASE Visual or performance mockup purpose: Test configuration and relationship to proposed work: Acceptance criteria: Issue / owner / correction: Approved sample and document revision: Structural survey and out-of-tolerance response: Fabrication release authority: DELIVERY AND COMPLETION Transport and storage constraints: Site readiness: Specialist erection and temporary-condition plan reference: Work that becomes inaccessible: Responsibility for changes or delayed delivery: Total-cost scope, exclusions and contingency: HANDOVER Approved/as-built drawings: Factory and field inspections and tests: Closed defects: Joint materials / glazing / replaceable parts: Cleaning and maintenance access: Inspection and maintenance schedule: Warranty responsibilities and contacts: SOURCE CONTEXT Clark Pacific early coordination guidance: https://www.clarkpacific.com/considering-a-prefabricated-facade-heres-what-you-need-to-know/ High Concrete wall-system distinctions: https://www.highconcrete.com/products/precast-concrete-walls/