WASTE-TO-ENERGY FACILITY COMPARISON Yenra | Updated September 7, 2026 Article: https://yenra.com/power/wte.html Purpose: compare municipal-waste combustion with realistic alternatives managing the same waste. Complete one record per option. Obtain actual permits and operating reports; this is an evidence-organizing form, not an environmental approval. Facility/location/technology and development stage: Reporting period and document dates: Waste source, composition and accepted annual mass: Mass unit (metric tonnes or U.S. short tons): Prevention/recycling/organics diversion assumed: Alternative disposal facility and transport route: Supply contract term and minimum tonnage: ENERGY BOUNDARY Gross generation (MWh per stated period): Own-use electricity (MWh, same period): Net export = gross minus own-use (MWh): Useful heat delivered (MWh thermal), customer and temperature: Waste energy input, HHV/LHV and moisture basis: Biogenic fraction: mass or energy basis and method: Fictional one-day balance: 180 metric tonnes; 144 MWh gross minus 24 MWh plant use = 120 MWh net, or average net 5 MW across 24 hours. Net export per tonne = 120,000 / 180 = about 667 kWh. Efficiency needs fuel-energy input too. ENVIRONMENT AND RESIDUALS Permit authority, document and relevant pollutant limits: Measured emissions, units, averaging periods and dates: Exceedances and corrective actions: Bottom ash / fly ash / control residues: quantities, analyses, destinations: Metals recovered and allowed reuse documentation: Water, odor, noise and truck-traffic evidence: Climate model, baseline, system boundary and displaced energy: COST AND CONTINGENCY Total cost and revenue with transport/disposal included: Energy-customer contract and availability: Downtime disposal arrangement and cost responsibility: Lower-throughput or changed-composition case: Unresolved item / responsible party / document needed: Comparison conclusion and reason: REFERENCE CONTEXT The linked article explains the comparisons and limits. Check exact project or equipment documents before using a specification. EPA’s municipal-waste combustion guidance https://www.epa.gov/smm/energy-recovery-combustion-municipal-solid-waste-msw EIA’s waste-to-energy explanation https://www.eia.gov/energyexplained/biomass/waste-to-energy.php EPA’s efficiency method https://www.epa.gov/chp/methods-calculating-chp-efficiency WARM management-practices documentation https://www.epa.gov/system/files/documents/2024-01/warm_management_practices_v16_dec.pdf