Regional reliability evidence record Yenra | Updated October 1, 2026 Article: https://yenra.com/power-grid-security/ Purpose: document what a reliability claim actually tests. This is a reading aid, not an engineering study or an operating procedure. 1. Identify the region and dated study. Operator: __________ Geographic/electrical boundary: __________ Study title/URL/version: __________ Publication date: __________ Forecast years/season: __________ Connection points: __________ 2. Copy assumptions with units and sources. Peak demand (MW): ____ Available local output (MW): ____ Available imports (MW): ____ Reserve requirements (MW): ____ Fuel/weather dependencies: ____ Studied outage/contingency: ____ 3. Screen arithmetic, then record the study evidence. Supply margin (MW) = available local output + imports - demand. Repeat using the documented resources available after the named outage. This screen omits detailed reserve, voltage, stability and network limits. Engineering finding and exact page/table: __________ 4. Record proposed improvement, approval/construction status, unresolved assumptions and the next document needed to resolve them: __________ FICTIONAL EXAMPLE: 70 MW local + 100 MW imports - 150 MW peak = 20 MW. After an assumed import reduction to 60 MW: 70 + 60 - 150 = -20 MW. That is a 20 MW gap under the assumptions, not a verified operating limit. Keep ratings separate from dependable resources and avoid counting a resource twice. Correlated fuel and transmission constraints need study. Source context: NMISA April 2026 Seven-Year Outlook; use its own system boundary and study period. Find current reports at https://www.nmisa.com/documents-2/