PLANT-FLOOR MATERIAL VISIBILITY: TRACK AND RECONCILE WIP Yenra | Updated September 11, 2026 Article: https://yenra.com/plant-floor-supply-chain-visibility/ Purpose: define a small material-tracking pilot and reconcile its event ledger with stock. Use one material route first. Keep material and container identities separate; define quantity units and what each event changes before configuring reports. Mark unknowns and assign an exception owner. ROUTE AND RULES Material / lot or serial / reusable-container identity: Locations and read points / route owner / units and controlled conversions: Physical stock rule / quality-hold rule / available and reserved stock rules: Receive, move, consume, produce, scrap, hold, split, rework and return semantics: Parent-child or transformation relationships to preserve: Event ID / source device / event time with timezone / receipt time with timezone: Duplicate detection / delayed and out-of-order events / offline operation: Correction mechanism / retained prior evidence / recomputation owner: EVENT LEDGER Event ID | material/lot/container | event time | receipt time | action | quantity/unit | from/to | job | evidence: 1. 2. 3. FICTIONAL RECONCILIATION (pieces, teaching ledger; not an EPCIS payload) Initial lot 100. Move all 100 to buffer: location changes, total remains 100. Consume 30; scrap 2. Expected physical stock = 100 - 30 - 2 = 68. Controlled count = 58; observed minus expected = -10. Evidence finds a further 10-piece consumption at 10:15, received at 11:00. Apply that previously unrecorded event once: 100 - 30 - 2 - 10 = 58. Do not combine an unexplained overwrite with a later duplicate consumption. RECONCILIATION RECORD Checkpoint / physical count method and unit / counted identity: Expected balance / counted balance / signed difference: Missing, duplicated or incorrect event evidence: Approved correction and reason / event or audit IDs retained: Recomputed stock / affected reservations, jobs or quality holds: Reviewer / date / prevention action: EXCEPTIONS AND PILOT ACCEPTANCE Exception | affected job/material | observation age | owner | action | physical confirmation: Tests: missed scan, repeat transmission, delayed upload, split lot, restart: Sample stock checks / job-to-consumption trace / event delay / time to resolution: Pilot decision / unresolved gaps / expansion conditions: Recheck identity, unit, event-semantic or integration changes. PRIMARY REFERENCES GS1's EPCIS and Core Business Vocabulary overview https://www.gs1.org/standards/epcis GS1 implementation guideline https://ref.gs1.org/guidelines/epcis-cbv/1.2.0/ event and record-time semantics and error declarations https://ref.gs1.org/standards/epcis/2.0.1/