MOBILE WORKFLOW ASSESSMENT Article: https://yenra.com/mobility-assessment/ Prepared: September 8, 2026. Edit one copy per candidate workflow. Purpose: decide pilot / revise / defer from observed work and explicit criteria. WORKFLOW Person doing the task / person accepting its result / owner: Trigger, location, steps, handoffs and accepted result: Exceptions observed: User accessibility, physical-work and environmental needs: Authoritative system / correction and approval owner: BASELINE (include units, observation period and sample size) Observed tasks n: Average active handling time, minutes/task: Average elapsed completion time, minutes/task: Average re-entry time, minutes/task: Corrections or rework, count out of n: Delay until receiving person can use the result, minutes: Conditions and unusual cases included or omitted: READINESS EVIDENCE Coverage and interruption duration where work occurs: Offline work needed and reconciliation dependency: Required system interface and its current availability: Who can view / submit / correct / approve records: Device custody, charging, shared-user access and replacement: Support owner and fallback workflow: Blocking constraint / owner / next check: PILOT DESIGN Hypothesis: Representative users, tasks, exceptions and duration: Success criteria set before the trial (metric, units, threshold): Fallback and stop conditions: Observed end-to-end result through authoritative-system acceptance: Added review, exception, support or device-management work: User and receiver feedback: DECISION Pilot / revise / defer: Evidence and remaining assumptions: Required next action / owner / date: Evidence that would justify reopening a deferred decision: FICTIONAL EXAMPLE, NOT MEASURED RESULTS 40 receipts; 8 active minutes/task including 3 minutes of transcription; 4 corrections out of 40. Removing that whole step gives an upper-bound opportunity of 40 x 3 = 120 minutes before new work is accounted for. Illustrative pilot criteria: at least 40 representative tasks; average active time <= 6 minutes; correction count <= 4/40; successful reconciliation after an interruption. These are project examples, not universal thresholds. Discovery-method context: https://www.gov.uk/service-manual/agile-delivery/how-the-discovery-phase-works