YENRA — KITCHEN PROJECT WORKSHEET Companion guide: https://yenra.com/kitchen-renovation/ Planning worksheet; verify designs, quotes and local requirements with the responsible professionals. PROJECT BRIEF Project / date / decision maker: Three daily problems to solve: Must-haves: Acceptable alternatives: Retained items and exclusions: Measured plan / photos / appliance drawing references: Accessibility and household needs: Existing water damage or other conditions to assess: Permit / inspection / lead-safe assessment responsibilities: QUOTE COMPARISON — COMPLETE FOR EACH BIDDER Contractor, license verification, insurance, references: Scope / drawings revision priced: Fixed-price work and amount: Allowances, assumptions and exclusions: Appliance and material models: Delivery, removal, taxes and making-good included?: Ordering, receiving, damage/return responsibilities: Start dependencies / estimated completion: Payment milestones and applicable deposit rules checked: Change approval procedure / warranty / completion documents: BUDGET — FICTIONAL EXAMPLE, NOT MARKET PRICES Cabinets and installation: $12,000 Counters: $5,000 Appliances: $4,000 Plumbing, electrical and ventilation: $6,000 Finishes, permits, delivery and other project costs: $3,000 Subtotal: $30,000 Illustrative reserve at 15%: $4,500 (not a universal recommended percentage) Total envelope: $34,500 After an approved $2,000 change: planned work $32,000; reserve $2,500. The envelope stays $34,500. Record any additional time/household costs separately. YOUR BUDGET Confirmed / planned work: Allowances still unresolved: Reserve and reason for its size: Total funding envelope: CHANGE RECORD — REPEAT AS NEEDED Date / proposed change / reason: Added or removed scope: Price effect / schedule effect / temporary household cost effect: Approved by / written approval reference: Revised committed total / remaining reserve: BEFORE DEMOLITION Permits as applicable; design and dimensions verified; required products available; household food/washing plan; work separation; interruption windows; waste route; plan for unexpected conditions and written change approval. HANDOVER Required inspections and approvals: Appliance operation / ventilation / shutoff-location demonstrations: Cabinet and finish checks / remaining work list and responsible person: Manuals / model numbers / finish identifiers / care instructions: Warranty and service contacts / agreed closeout of outstanding work: