YENRA EQUIPMENT AUCTION BID PLANNER Guide: https://yenra.com/heavy-equipment-auction/ Prepared: September 11, 2026 Use: Complete before bidding. Keep listing, inspection, fee schedule, transport quote and sale terms together. All costs must use one currency. Unknown costs remain open questions; do not enter zero by default. LOT AND JOB FIT Auction / event / lot / closing date and timezone: Physical location: Model / serial / stated year / meter: Attachments included: Required task and configuration: Transport dimensions / weight / source: Manufacturer documentation checked: Service support: EVIDENCE (MARK VERIFIED, REPORTED OR UNKNOWN) Identity: Maintenance history: Condition / qualified inspector / date / scope: Tests performed: Excluded systems / inaccessible items: Repairs priced / evidence: Ownership or registration documents / restrictions: Unresolved questions / responsible person / deadline: SALE TERMS Terms URL / saved date: Buyer fee: rate, tiers, minimums, caps and taxable treatment: Tax: rate, tax base, jurisdiction and person confirming: Document charges: Payment deadline / verified instructions: Release conditions: Collection deadline: Loading responsibility: Transport quote / insurance / permits: Storage or other charges: Inspection coverage / dispute policy / deadlines: TOTAL-COST MODEL All-in budget: Candidate bid: Actual fee function for that bid: Tax on the applicable base: Inspection: Transport: Immediate repairs: Other charges: Uncertainty allowance: Total: Remaining budget: Maximum bid rounded DOWN to an available increment: Walk-away criteria: General method: Total = bid + actual buyer fee + actual tax + all other costs. Recalculate using the event's fee tiers and minimums. Obtain an invoice estimate if the tax base or fee treatment is unclear. FICTIONAL FLAT-FEE EXAMPLE (NOT AN ACTUAL AUCTION SCHEDULE) Budget $30,000. Inspection $500; transport $1,500; repairs $2,000; uncertainty $1,000. Other-cost allowance total = $5,000. Assume 10% fee on bid and 6% tax on bid plus fee. Total = bid x 1.10 x 1.06 + $5,000 = bid x 1.166 + $5,000. Ceiling = ($30,000 - $5,000) / 1.166 = $21,440.82. With $500 increments, choose a limit of $21,000: $21,000 + $2,100 fee + $1,386 tax + $5,000 = $29,486. At $21,500, total = $30,069, which exceeds the budget. COLLECTION Machine / serial / attachments match: Condition photos and differences: Invoice / release / transport documents: Issues reported through applicable process: Qualified checks and maintenance before work: SOURCE CONTEXT Current Ritchie Bros. fees (region and event may differ): https://www.rbauction.com/buying/buyer-fees IronPlanet condition-report program (review individual report and policy): https://www.ironplanet.com/ironclad-assurance?kwtag=newhomepage