COMMUNICATIONS CONTINUITY BRIEF Yenra | Updated September 17, 2026 Article: https://yenra.com/generators/ Purpose: document the dependencies of a specified communications service. Use with the site owner and network operator. Record evidence, date and owner for each answer. Do not infer public network endurance from this screening calculation. Service / site / date / responsible team: Required service and duration (hours): Measured demand at the protected boundary (kW): Usable battery energy at that boundary, with age, temperature and reserve assumptions (kWh): Battery endurance = usable kWh / constant kW (hours): Generator arrival, setup and accepted-load time after outage (hours): Gap before accepted generator service (hours): Fuel quantity, consumption basis, replenishment and site access: Backhaul route, its power dependencies and alternate route: Roaming / temporary-site assumptions and supporting evidence: Readiness test date, conditions, result and unresolved actions: Fictional example: 12 kWh / 3 kW = 4 hours. Service accepted at hour 5 leaves a one-hour gap. Constant demand, usable energy and no alternative supply are assumed. Validate actual discharge behavior and transition separately. Primary references used in the article: https://docs.fcc.gov/public/attachments/DOC-357387A1.pdf https://docs.fcc.gov/public/attachments/DOC-309319A1.pdf