YENRA - FLEXIBLE COMPUTING PILOT PLAN Source guide: https://yenra.com/flexible-computing/ Prepared September 10, 2026. Save and complete in a text editor. Define the decision and acceptance criteria before the experiment. Run failures only inside an authorized, bounded test environment. Workload / application owner / operator: ________ Observed problem and supporting measurement: ___ One proposed change: __________________________ Baseline configuration and version: ____________ Proposed configuration and version: ____________ Representative inputs / identifiers / checksum: _ Correct expected result and validation method: _ DEPENDENCIES State that must survive: _______________________ Rebuildable state: _____________________________ OS / architecture / licenses / support: ________ Network / identity / external dependencies: _____ Quotas / capacity limits / permissions: ________ Who handles patching / alerts / recovery / cost? _______________________________________________ ACCEPTANCE CRITERIA - specify units and limits Completion time or latency: ____________________ Correctness and allowed error rate: ____________ Total resource time and maximum cost: __________ Allowed interruption and recovery behavior: ____ Operator effort / lead time: ___________________ Rollback trigger: _____________________________ Rollback procedure and data prerequisites: _____ FICTIONAL EXAMPLE 240 independent reports x 3 worker-minutes = 720 minutes = 12 worker-hours. 4 workers: 180 processing minutes; 8 workers: 90 processing minutes. If all workers initialize concurrently for 10 minutes: 4 workers: elapsed 190 minutes; allocated 760 worker-minutes = 12h40m. 8 workers: elapsed 100 minutes; allocated 800 worker-minutes = 13h20m. No queue delay, unequal runtimes, failures, or data contention assumed. Example target: finish within 120 minutes; all 240 valid outputs exactly once; one interrupted job recovers without duplicate output publication. Choose targets appropriate to your workload, not these invented values. EXECUTION RECORD Run ID / time / input set / configuration: ______ Initialization / processing / merge times: _____ Queue waits / resource usage / data transferred: _______________________________________________ Correctness / errors / service result: __________ Controlled failure and observed recovery: ______ Logs and evidence location: ____________________ Repeat count and variation: ____________________ Cleanup / retained resources / owner: __________ DECISION Expand, revise and repeat, or retain baseline: __ Evidence supporting the decision: ______________ Unresolved issue / owner / action date: _________ Workload or support change requiring recheck: ___