EFFICIENCY PROJECT AND VERIFICATION BRIEF Yenra | Updated September 7, 2026 Article: https://yenra.com/energy-efficiency/ PURPOSE AND INSTRUCTIONS Use with a qualified assessor to compare a building efficiency proposal. Complete the baseline before removing old equipment. Keep bills and measured data with this record. Record uncertainty and who is responsible for each estimate. PROJECT Building / assessor / date: Required service (light level, temperature, ventilation, production): Equipment and meters inside the boundary: Interacting systems and treatment of their effects: Baseline period / reporting period: Meter units / missing data / estimated readings: Hours / occupancy / weather / production variables: Agreed adjustment method and evidence: Measured parameters / estimated parameters / uncertainty: CALCULATION Baseline energy adjusted to reporting conditions (kWh or other stated unit): Reporting-period energy at the same boundary: Savings = adjusted baseline minus reporting energy: Rate and tariff assumptions: Energy-cost saving / demand-charge change / other bill effects: Additional annual service or maintenance cost: Installed cost / commissioning / financing / replacements: Net annual benefit: Simple payback = installed cost / positive net annual benefit: For lifetime comparison, record annual cash flows and discount assumptions separately. FICTIONAL CHECK Old lighting: 12 kW, originally 3,000 hours = 36,000 kWh. Reporting-year hours: 3,300. Adjusted baseline: 12 x 3,300 = 39,600 kWh. New lighting: 8 x 3,300 = 26,400 kWh, with required illumination maintained. Savings: 13,200 kWh (33.3% of adjusted baseline). At fictional $0.15/kWh: $1,980/year. Added service $180: net $1,800/year. Fictional installed $9,000 / $1,800 = 5 years simple payback. Excludes financing, demand charges, taxes, tariff changes, degradation and HVAC interactions. Substitute project data; preserve the same comparison boundary. ACCEPTANCE AND FOLLOW-UP Service checks / commissioning criteria: Data owner / review schedule / responsible reviewer: Shortfall procedure / control overrides / maintenance findings: Lower-savings case and decision: REFERENCE CONTEXT The linked article explains the comparisons and limits. Check exact project or equipment documents before using a specification. DOE’s FEMP measurement and verification guidelines, Version 5.0 https://www.energy.gov/cmei/femp/articles/mv-guidelines-measurement-and-verification-performance-based-contracts-version-0 FEMP describes four M&V approaches https://www.energy.gov/cmei/femp/measurement-and-verification-options-federal-energy-and-water-saving-projects ENERGY STAR’s energy use intensity explanation https://www.energystar.gov/buildings/benchmark/understand-metrics/what-eui