POWERTRAIN HIL TEST BRIEF Yenra | Updated September 8, 2026 Article: https://yenra.com/electrical-simulator/ PURPOSE Define one repeatable controller HIL test before choosing timing and model detail. Use with the controller requirements and approved bench documentation. This brief covers signal-level controller HIL; power HIL needs its own review. IDENTITY AND BOUNDARY Requirement ID and test objective: Controller hardware/software/build: Plant model/version and parameter source: Real hardware in the loop: Modeled inverter, motor, battery and mechanical subsystems: Simplifications and validated operating range: Reference comparison and accepted error limits: TIMING Controller sample time (microseconds): PWM frequency (Hz); period = 1,000,000 / frequency (microseconds): Plant timestep; worst-case execution time; overrun count: Event-capture resolution and required dead-time representation: Measured end-to-end input/computation/output delay and variation: Fictional check: 10 kHz PWM has a 100 microsecond period. A 5 microsecond step gives 20 steps/period. A 6 microsecond execution misses a 5 microsecond deadline. Resolution alone does not establish accuracy. SIGNAL MAP — repeat per channel Channel/name and direction: Physical variable, units, range, sign and offset: Electrical interface, update rate and calibration: Clipping/invalid/disconnection behavior: Timestamp source and alignment: SCENARIO — repeat per test Initial speed, torque, supply and controller state: Stimulus with start time, duration and magnitude: Expected response: Numerical pass criteria and their requirement source: Variables recorded; sample rate; allowed uncertainty: Reset condition: Result: PASS / FAIL / MODEL LIMITATION / NOT RUN: Evidence file and reviewer: DIAGNOSIS AND RECORD Check units, sign, clipping, latency, overruns and initial state before attributing a discrepancy to control logic. Keep the failing configuration. Archive controller build, model, parameters, interface configuration, stimulus and result trace together. Record physical-validation needs. Open issue | next check | owner | date: REFERENCE CONTEXT The linked article explains the comparisons and limits. Check exact project or equipment documents before using a specification. The What, Where and Why of Real-Time Simulation https://blob.opal-rt.com/medias/L00161_0436.pdf motor-drive HIL preparation guidance https://www.opal-rt.com/blog/what-engineering-teams-need-before-launching-a-motor-drive-hil-program/