ELECTRIC UTILITY TRUCK REQUIREMENTS AND PILOT RECORD Guide: https://yenra.com/electric-trucks/ Use: define requirements before quotations; duplicate the shift record for each run. Units: record miles or km, pounds or kg, kWh, kW, hours, and currency explicitly. Operate within manufacturer limits with trained operators. This is not a driving guide. SITE AND WORK Fleet / site / intended public-road segments and approval evidence: Tasks / distances / grades / surfaces / access constraints: Crew / tools / body / accessories / maximum accumulated cargo: Shift start-end / next departure / reliable charging window: Seasons and demanding work conditions to represent: CANDIDATE Manufacturer / exact model / battery / body / charger: Payload definition and applicable vehicle, axle, bed, attachment and towing limits: Source document and revision / measured loaded weights: Usable energy and permitted charge window from supplier: Auxiliary equipment requirements and operating limits: Site power assessment / permit and utility tasks / responsible provider: Service location / recovery arrangements / parts and battery terms: ACCEPTANCE CRITERIA - AGREE BEFORE PILOT Required work completed: Minimum agreed end-of-shift reserve and units: Required next-departure readiness: Acceptable loading access / operator requirements / service response: Fallback if vehicle or charger unavailable: SHIFT RECORD Date / operator / vehicle configuration: Weather and temperature / heating or cooling / powered equipment: Route / distance and units / actual load and units: Battery state at departure and return / source of measurement: Tasks completed / omitted / extra trips: Charger / plug-in time / charging complete / next departure: Metered electricity (kWh) / tariff and applicable demand charges: Faults / delays / operator observations: Met criteria? / corrective action / retest date: FICTIONAL ARITHMETIC EXAMPLE, NOT A VEHICLE RATING 12 kWh route energy + 3 kWh contingency = 15 kWh battery replenishment target. 15 kWh / 3 kW assumed average battery-side charging = 5 hours. 8-hour window - 5 hours = 3 hours apparent slack. Verify usable capacity, charging profile, temperature effects and real turnaround. Metered electricity can exceed battery replenishment because of losses. DECISION Capital quotations / recurring costs / exceptional costs / uncertainty range: Comparison vehicle and equal-work assumptions: Untested conditions / evidence still needed / next decision: