INTERCONNECTION EVIDENCE REGISTER Yenra | Updated September 8, 2026 Article: https://yenra.com/distributed-generator-interconnection-relay/ PURPOSE Organize the owner/engineer/utility evidence package. This register provides no relay settings, wiring instructions or authorization to connect generation. PROJECT CONTEXT Site, utility and responsible protection engineer: Generator/storage technology and capacity: Connection point and one-line diagram revision: Parallel/export-limited/intentional-island/transfer modes: Applicable utility rules, adopted editions and agreement: DOCUMENT REGISTER For EACH item record: document ID, revision/date, author, review status, outstanding condition, owner and closure evidence. - Protection narrative and coordination study. - Relay model, serial number, firmware and configuration record. - Applicable certification/type-test evidence. - Approved settings and current drawings. - Voltage/frequency, synchronizing and islanding requirements. - Grounding and fault-protection coordination. - Sensing, trip path, auxiliary supply and communication failure response. - Commissioning plan, required witnesses and acceptance criteria. - Signed test records and utility permission conditions. Fictional review example: the proposed relay supports several functions, but the drawing omits the breaker trip path and the test plan names a different firmware revision. Request reconciled documents and the required review before treating those items as closed. HANDOVER Approved configuration location and access control: Event-record retrieval responsibility and service contacts: Open item / required evidence / responsible party / due date: Who accepts results and gives required permission: Changes requiring renewed review, confirmed with utility/engineer: Include capacity, operating mode, firmware and protection changes. Maintain the final approved record with the installation; a data sheet, commissioning result and utility permission establish different things. REFERENCE CONTEXT The linked article explains the comparisons and limits. Check exact project or equipment documents before using a specification. October 2021 guide to updating interconnection rules https://research-hub.nlr.gov/en/publications/a-guide-to-updating-interconnection-rules-and-incorporating-ieee-/ synchronization-system overview https://selinc.com/engineering-services/synchronization/ interconnection-standards overview https://www.nlr.gov/state-local-tribal/basics-interconnection-standards