DATA CENTER COMMUNITY REVIEW WORKSHEET Yenra | September 17, 2026 Guide: https://yenra.com/cnstrctn/data-centers.html Purpose: Compare a specific proposal with local priorities and record the evidence needed to support, seek changes, defer or oppose it. Copy this plain-text file into your preferred editor. Duplicate the evidence and commitment records as needed. Keep document dates and page references. Use "unknown" for missing information. This worksheet is a discussion aid; local authorities determine applicable approvals and lawful conditions. 1. PROPOSAL AND DECISION Project / application number: Location / acreage: Landowner / developer / expected operator: Decision-making body / approval requested: Current zoning / uses already allowed: Hearing date / comment deadline / official submission instructions: Latest plan version and source URL: Phase 1 buildings, timing and capacity: Full buildout buildings, timing and capacity: Other approvals and responsible agencies: Feasible alternative sites, sizes or uses / evidence of feasibility: 2. EVIDENCE RECORD (duplicate for each important claim) Claim / topic: Status: documented / projected / promised / unknown Source, author, date, URL and page: Scope: phase / full buildout / local / regional / national Units and assumptions: Who verified it / remaining uncertainty: Who benefits / who bears costs: Question to resolve / person responsible / due date: 3. LOCAL FISCAL AND JOBS CHECK Use a separate entry for each year and each government receiving revenue. Year / government: Gross local receipts ($ per year): Rebates and other deductions ($ per year): Added public operating and annual financing costs ($ per year): Net annual amount ($ per year): One-time public capital costs ($, timing): Are tax exemptions already reflected in gross receipts? Avoid double counting. Equipment depreciation / replacement assumptions: Opening date / occupancy / phase assumptions: Results if opening is delayed or buildout is reduced: Exposure if the operator closes or fails to meet commitments: Construction peak workers (people): Construction job-years (one worker for one year = one job-year): Permanent on-site employees (people): Ongoing contractors (people; identify overlap with other counts): Wages / local recruitment / training provider / funded places: Local purchasing assumptions and evidence: Indirect jobs (identify model and geography separately): Fictional example, not a forecast or quotation: $8m annual gross - $2m rebates - $1.5m added expenses = $4.5m annual net. $18m upfront / $4.5m annual net = 4 years after that net begins. At $5m gross, the same deductions leave $1.5m net; recovery = 12 years. These simple calculations exclude financing, discounting, inflation, depreciation and delays. A full analysis needs year-by-year cash flows. 4. ELECTRICITY AND WATER State the phase and whether numbers cover IT equipment or the whole site. Peak grid demand (MW): Average whole-facility load (MW): Annual energy (MWh per year): Reserved connection capacity (MW): Utility capacity assessment / service commitment / remaining approvals: Generation, substation and transmission work / completion dates: Who pays / approved rate schedule / minimum payments / deposits: Cancellation, reduced-load and closure terms: Remaining risks for other ratepayers: Clean-energy claim / generation location / timing / verification: Demand-reduction commitment (MW, hours, frequency, verification): Annual water withdrawal (gallons or liters per year; identify unit): Peak-day water demand (gallons or liters per day): Consumptive use / wastewater discharge (same clearly labeled units): Potable, reclaimed or other source: Cooling and heat-rejection system / alternatives: Utility supply, treatment and pipe capacity assessment: Drought assumptions / competing committed demand: Drought actions / responsible authority / consequences: Water and wastewater upgrades / cost responsibility: PUE or WUE claim / metric definition / boundary / measurement period: Fictional energy example: 40 MW average whole-facility load x 8,760 hours = 350,400 MWh in a non-leap year. Maximum connection capacity alone cannot determine use. 5. NEIGHBORHOOD AND CONSTRUCTION Nearest homes, schools and other sensitive locations: Residents consulted, including renters: Baseline sound measurements / full-buildout acoustic study: Nighttime, tones, low-frequency sound and generator testing covered? Post-opening noise check / complaint response and remedy: Views, lighting and seasonal screening: Construction hours / truck routes / dust / road damage responsibility: Stormwater, erosion, streams, habitat and historic-resource review: Other approved/proposed projects included in cumulative review: Generator count / fuels / testing / backup / regular generation: Air permit authority / application / limits / emissions assessment: Fire and emergency planning / public equipment or training costs: 6. COMMITMENT RECORD (duplicate for each condition) Specific obligation and measurable limit or deliverable: Responsible party: Governing approval, permit, utility term or agreement: Authority confirming this condition is lawful and enforceable: Deadline / phase trigger: Verifier / funding for independent checks: Public reporting schedule and location: Complaint channel / response deadline: Remedy if unmet: Effect of expansion, ownership change or closure: 7. POSITION AND FOLLOW-UP Position: support / seek changes / request deferral / oppose Three strongest reasons, with document references: Unresolved consequential issue(s): Changes or evidence that would change my position: Requested decision and exact conditions: Comment submitted on / copy saved at: Final approval and conditions checked on: Next published report, phase application or review date: