YENRA BATHROOM-POD COORDINATION BRIEF Guide: https://yenra.com/cnstrctn/pre-built-bathrooms.html Prepared: September 11, 2026 Use: Save and edit during design meetings. Assign an owner and deadline to each open decision. This brief organizes project-specific design evidence; it provides no installation dimensions or approval of an assembly. PROJECT AND FEASIBILITY Project / location / date / drawing revision: Owner / architect / contractor / pod supplier: Room count / pod count / variants and handedness: Accessible-room types and responsible reviewer: Brand and operating requirements: Structural, floor-level and service constraints: Transport / site access / final-location route: Scope remaining field-built: Complete-cost comparison against equivalent field-built work: REPEAT THIS INTERFACE ENTRY AS NEEDED Interface: structure / floor transition / services / waterproofing / fire or acoustic interface / surrounding enclosure / other: Question to resolve: Design criteria and units: Drawing / document revision: Decision owner: Designer / reviewer: Factory scope: Site installer and scope: Inspection or test evidence: Required decision date: Status / closure evidence: DESIGN FREEZE AND MOCKUP Prototype / mockup reviewed: Appearance / operation / cleaning / maintenance access: Accessibility review of room and building interfaces: Issues / owner / due date: Approved production revision: Change-control process and cost responsibility: SEQUENCE Factory inspection: Production release: Site-readiness confirmation: Dispatch / protection: Delivery / condition record: Setting complete: Connections complete: Testing and inspection complete: Surrounding work and protection complete: Ready-for-use acceptance: Distinguish delivery and setting dates from usable-room completion. HANDOVER Factory and site test records: As-built service locations: Maintenance access and spare parts: Damage or defect resolution: Warranty scope and contacts: SOURCE CONTEXT SurePods process: https://www.surepods.com/what-we-do/our-process U.S. Access Board transient-lodging provisions: https://www.access-board.gov/ada/chapter/ch08/#806-transient-lodging-guest-rooms Have the project team resolve applicable local rules and required approvals.