Remote school or branch satellite network worksheet Yenra | Updated September 28, 2026 Guide: https://yenra.com/broadband-satellite-network/ One record per site: Site name / coordinates / country / access contact: Hours / essential activities / maximum acceptable interruption: Concurrent sessions by application / downlink Mbps / uplink Mbps: Background jobs / update windows / daily and monthly GB: Estimate source: measurement, application specification or assumption: Local rooms / cabling / Wi-Fi access points / coverage test: Provider / terminal / plan / pooled capacity and data rules: Power loads W by component / required runtime h: Measured runtime / restart / charging / responsible installer: Administration / user groups / credential recovery owner: Monitoring / support hours / local triage contact: Pilot date / users / rooms / activities / actual outcomes: Load, data and interruption measurements: Recovery test / defect / owner / retest: Equipment + install + recurring service + extras + power + travel + staff cost: Expansion decision: Example only: (24 x 0.5 Mbps + 2 Mbps) x 1.25 = 17.5 Mbps downlink. Upload must be budgeted independently. These are invented workloads. Power example: 80 W x 8 h = 640 Wh delivered; 640/0.85 = 752.94 Wh ideal battery draw. This is not a battery or solar sizing specification. Source context: This worksheet accompanies the linked guide and its primary-source references.