Boat-auction bid worksheet Yenra | Updated September 13, 2026 Article: https://yenra.com/boat-auctions/ INSTRUCTIONS Use current lot terms and one currency. All sample numbers below are fictional. This is arithmetic and decision support, not a boat valuation, title opinion or tax determination. Auction / date / lot: Terms version and amendments: Format / reserve / seller acceptance / bid increments: Boat and engine identifiers: Seller authority and transfer documents: Inspection scope / exclusions / findings: Included trailer and equipment: Payment deadline and approved method: Responsibility transfer / insurance: Removal deadline / lifting access / transport quote: COST INPUTS (currency: ______) Total budget B: Inspection: Transport and lifting: Other fixed charges: Immediate work with source/date: Uncertainty reserve: Total fixed costs and reserve F: Buyer's premium p (decimal): Tax t (decimal): Tax base confirmed by / date: Additional tiers or fees requiring a different formula: SIMPLIFIED FORMULA Only if premium is p times hammer bid and tax is t times (hammer bid + premium): Hmax = (B - F) / ((1 + p) * (1 + t)) Round DOWN to an allowed bid increment. Recheck: Total = H + (H*p) + ((H + H*p)*t) + F. Change the calculation for the actual fee and tax rules. FICTIONAL CHECK B = 15000; F = 4500; p = 0.10; t = 0.06. F = transport 1000 + other 500 + immediate work 2000 + reserve 1000. Hmax = 10500 / 1.166 = approximately 9005.14. At hypothetical 500 increments: H = 9000. 9000 + 900 + 594 + 4500 = 14994. My documented ceiling: Higher-repair-cost scenario: Unresolved questions / evidence needed: Decision and reasons: Handover documents / condition photos / removal arrangements: Source context: Follow the article links to the relevant manuals, operator terms and local authorities. This worksheet organizes your findings; record the source and date of each consequential answer.