BIOGAS PROJECT EVIDENCE BRIEF Yenra | Updated September 7, 2026 Article: https://yenra.com/biogas/ Purpose: trace a biogas project's material, energy and methane evidence. Fill one record for each proposed configuration, using project documents and measured data. Qualified specialists must handle gas-system design and operation. Project/location, operator and stage: Feedstock types and quantities (state units and period): Composition, contamination and seasonality evidence: Supply agreements and rejected-load arrangements: Digester design basis and relevant operating references: Operator staffing, training, maintenance and downtime plan: GAS RECORD Raw-gas quantity and period: Volume reference temperature/pressure; wet or dry basis: Methane fraction and gas-analysis source: Treatment process and product-quality requirement: Methane recovery into product (%), measurement basis: Product quantity and purity: Off-gas destinations; methane oxidation, flaring, venting or other fate: Treatment/compression electricity and digester heat (units/period): Energy customer, connection or purchase agreement: Fictional component balance on one dry standard-volume basis: 1,000 cubic metres x 60% methane = 600 cubic metres methane. At 98% product recovery: 588 in product and 12 elsewhere. The 12 is not automatically an atmospheric emission; identify its fate. Total product volume also needs product purity. DIGESTATE AND CLIMATE Digestate quantity, analysis, treatment, storage and destination: Alternative feedstock-management baseline and existing gas recovery: Methane detection coverage, measured losses and repair records: Transport, energy supply, digestate emissions and displaced service: Greenhouse-gas metric/time horizon and uncertainty: Result per delivered energy and/or waste managed, with units: COMMERCIAL CHECK Capital, utilities, labor, consumables and maintenance: Contracted revenue versus assumed credits/incentives: Authority confirming any incentive eligibility: Risk owner for off-spec gas, rejected feedstock and customer interruption: Open question / responsible party / evidence needed: REFERENCE CONTEXT The linked article explains the comparisons and limits. Check exact project or equipment documents before using a specification. EPA AgSTAR’s digestion explanation https://www.epa.gov/agstar/how-does-anaerobic-digestion-work DOE’s Alternative Fuels Data Center https://afdc.energy.gov/fuels/natural-gas-production EPA’s RNG facility-operation best practices https://www.epa.gov/system/files/documents/2022-11/RNG_Operations_Guide.pdf AgSTAR project development handbook https://www.epa.gov/sites/default/files/2014-12/documents/agstar-handbook.pdf