UPS LOAD AND SHUTDOWN PLANNER Yenra | Updated September 7, 2026 Article: https://yenra.com/battery-backup/ Use this record for ordinary office electronics. Medical or critical equipment needs its own approved backup plan. Fill in one row per device. Required task during outage: _______________________________________ Save-work time (minutes): ____ Shutdown time: ____ Reserve: _________ Total runtime target (minutes): ____________________________________ DEVICE | MEASURED W | MEASURED VA/PF | PEAK/STARTUP | BATTERY NEEDED? _______|____________|________________|______________|________________ _______|____________|________________|______________|________________ _______|____________|________________|______________|________________ Measurement tool/method/date and operating workload: ________________ Total running watts: ____ Highest representative load: _____________ VA evidence and planning margin: ___________________________________ FICTIONAL CHECK: desktop 180 W + monitor 30 W + networking 20 W = 230 W. If aggregate power factor were 0.8, VA = 230 / 0.8 = 287.5 VA. A chosen 25% watt margin gives 287.5 W; verify actual peaks separately. 3 minutes saving + 2 shutting down + 5 reserve = 10-minute target. An invented runtime curve giving 6 minutes at 230 W fails; 14 minutes warrants further checks. These are not product specifications. MODEL CHECK UPS exact model and regional input/output voltage: _________________ Output limits: ______ W / ______ VA Battery configuration: ________ Manufacturer curve URL and runtime at selected W: __________________ Waveform/transfer/active-PFC compatibility confirmation: ____________ Battery-backed sockets identified: ____ Supported loads only: ______ Upstream internet/phone dependencies: ______________________________ COMMISSIONING (FOLLOW EXACT MANUAL) Initial charging complete: ______ USB/network management link: _____ OS/NAS software version and compatibility: _________________________ Shutdown threshold and device order: _______________________________ Supported self-test method/date/log result: ________________________ Actual shutdown duration and reserve: ______________________________ Return-of-power/restart behavior: __________________________________ Never improvise an electrical test or overload the UPS. SERVICE Installed date: ______ Battery part/date: ______ Next check: ________ Recheck after equipment or software changes. Use supported batteries and recycling. Record alarms and corrective action, not just silencing. Guidance: https://www.se.com/us/en/work/support/product-support/ups-buying-guide-for-selecting-a-battery-backup-system/