ESSENTIAL-LOAD AND GENERATOR PLANNING BRIEF Yenra | Updated September 7, 2026 Article: https://yenra.com/backup-generator/ Complete this brief BEFORE buying a generator. Have a qualified installer review the actual loads, site, fuel and transfer arrangement. U.S. scope. This is not a wiring, grounding or operating procedure. HOUSEHOLD NEED Loads that must run and why: ________________________________________ Required duration and person able to operate equipment: ______________ Alternative location/medical-device plan: ____________________________ LOAD | VOLTAGE | RUNNING W | TOTAL STARTING W | SOURCE | CAN DEFER? _____|_________|___________|__________________|________|____________ _____|_________|___________|__________________|________|____________ _____|_________|___________|__________________|________|____________ Simultaneous running total W: ______ Startup scenarios W: ___________ Automatic starts and reliability of sequencing: _____________________ Installer's transient/current/voltage review: ________________________ FICTIONAL ARITHMETIC (NOT EQUIPMENT RATINGS) Refrigerator 200 W running / 1200 W total startup. Pump 800 W running / 2400 W total startup. Lights/network 100 W. All running: 1100 W. Pump starts while others run: 2700 W. Both motors start together: 3700 W. Total starting W already includes that device's operating demand; do not add its running W again. Verify actual surge duration and limits. SYSTEM AND SITE REVIEW Model/fuel/continuous and short-duration ratings: ____________________ Required derating and runtime AT PLANNED LOAD: _______________________ Approved transfer equipment, permits and utility requirements: _______ Qualified installer and grounding/bonding design reference: __________ Never connect a generator to an ordinary home outlet to feed circuits. Portable unit location: outdoors, at least 20 feet from homes/buildings, exhaust away from openings; never in a house, garage, basement or shed. Approved weather protection and nearby buildings checked: ____________ Standby system listed siting/fuel requirements: ______________________ CO alarms with battery backup on each level/outside sleeping areas: ___ Fuel containers/storage rules and outage replenishment plan: _________ Shut down and let the unit cool before refueling. Follow exact manual. COMMISSIONING AND OWNERSHIP Demonstrated transfer/load/restoration behavior and date: ____________ Operator training and manual location: ______________________________ Maintenance/exercise schedule, service contact and failed-start plan: _ Installed price including fuel/transfer/site work: ___________________ References: https://powerequipment.honda.com/generators/connecting-a-generator-to-your-home https://powerequipment.honda.com/generators/generator-safety