NUCLEAR POWER CLAIM AND EVIDENCE RECORD Yenra | Updated September 7, 2026 Article: https://yenra.com/advantages-nuclear-power-pros/ Use one record per claim to keep the evidence and its limits together. This is an interpretation aid, not a universal technology score. CLAIM Exact claim in your own notes: ______________________________________ Named plant/design/site/jurisdiction: ________________________________ Decision: existing operation / new established design / advanced design Source URL, organization, publication and access dates: ______________ Measured result / operating experience / model / target: _____________ Current licensing/construction/operating stage: ______________________ COMPARISON BOUNDARY Metric and units (MW, MWh, g CO2e/kWh, cost, water, etc.): ____________ Period/geography/currency year: _____________________________________ Existing operating cost or full new project cost? ___________________ Financing, grid connection, owner costs, fuel, maintenance, waste and decommissioning included? ___________________________________________ Capacity factor/life/discount rate assumptions: ______________________ Alternative provides same service on needed schedule? _______________ Lifecycle boundary (including upstream/downstream activities): _______ FICTIONAL CALCULATION 1000 MW x 8760 hours x 90% capacity factor = 7,884,000 MWh = 7.884 TWh. At 75%: 6,570,000 MWh = 6.57 TWh. Assumes a 365-day year. Annual energy alone does not establish availability in a critical hour. RESPONSIBILITIES AND UNCERTAINTY Safety/inspection/emergency provisions and responsible body: _________ Fuel availability and spent-fuel storage/disposal pathway: ____________ Funding and long-term ownership: ____________________________________ Unresolved evidence needed: _________________________________________ What event would change this assessment? ____________________________ Next review date/trigger: ___________________________________________ References: https://www.nrc.gov/reactors/new-reactors/advanced https://www.nrc.gov/waste/spent-fuel-storage https://www.eia.gov/tools/faqs/faq.php?id=104&t=3