YENRA — PRIVATE 5G FACTORY PILOT BRIEF Guide: https://yenra.com/5g-smart-factory/ Prepared October 12, 2026. Blank targets must be set by the application owner. This planning aid is not a functional-safety assessment or an installation design. 1. DECISION AND OWNERS Production task: Current constraint and measured baseline: Business outcome that would justify change: Application owner / network owner / operations owner: Alternatives to compare (wired, Wi-Fi, cellular or other): 2. WORKLOAD — repeat for each device class Device/module, software and supported radio bands/features: Number active / planned growth: Useful payload size (bytes) and event rate (per second): Average and burst uplink / downlink (Mbps; label which is which): Traffic concurrency and overhead assumptions: Routes, speed (m/s or km/h), operating areas and obstructions: Power and duty-cycle requirements: 3. ACCEPTANCE — owner supplies values and definitions Transaction start and end points: Maximum acceptable completion delay (ms): Allowed loss or failure rate and definition: Maximum interruption/recovery time (seconds): Availability boundary and observation period: Required sample count and representative-load conditions: Method, timestamp/clock arrangement and instrumentation: Pass/fail rule, including unsuccessful runs: Reason these values meet the application requirement: 4. ARCHITECTURE AND DEPENDENCIES Radio / core / UPF / application locations: Spectrum authorization or operator arrangement: Subscriber/SIM onboarding and removal: Local and remote dependencies (DNS, identity, licences, storage, management): Raw data / results / retention / access: Support responsibility across suppliers: 5. APPROVED FAILURE TESTS For each: approval, safe test arrangement, expected behavior, observation and recovery. WAN unavailable: Application restart: Device reconnect/onboarding failure: Reduced network or compute capacity: Radio/edge maintenance: Lost/duplicate/out-of-order records: Rollback and stop criteria: 6. LIFECYCLE COSTS AND DECISION Equipment, integration, spectrum/service, compute, power/cooling: Monitoring, patching, training, spares and support: Software/device support horizon and replacement plan: Evidence gathered against each acceptance rule: Unresolved limits and assigned owners: Decision: accept / revise / reject; reason and date: SOURCE CONTEXT NIST Industrial Wireless 5G Testbed: https://www.nist.gov/programs-projects/nist-industrial-wireless-5g-testbed 3GPP Industrial 5G: https://www.3gpp.org/technologies/ind-5g 3GPP Industrial IoT and TSN: https://www.3gpp.org/technologies/tsn-v-lan These sources explain evaluation and capability context, not universal pilot targets.