3D CITY PLANNING: TOOL AND SCENARIO WORKSHEET Guide: https://yenra.com/3d/city-planning.html Template checked: October 3, 2026 How to use: Save one project copy; preserve a dated revision for each formal comparison. Replace bracketed fields. Record units and source references next to values. Keep the fictional example separate from your project results. This is a planning record, not a vendor model or a local planning-compliance calculation. 1. QUESTION AND DELIVERABLE Project / owner / reviewer: [ ] Decision this comparison should inform: [ ] Site boundary and area (units): [ ] Required output (metrics / images / walk-through / web viewer): [ ] Audience and accessible alternative to interactive 3D: [ ] 2. TOOL SELECTION Candidate and version/service checked: [ ] Official documentation URL and check date: [ ] Required input formats, attributes and coordinate support: [ ] Required output/export format and sharing route: [ ] Team skills / training / hardware requirements: [ ] Authoring seats, viewer access and cloud/data terms: [ ] Representative import/export test and result: [ ] Reason for selection and remaining limitation: [ ] 3. DATA INVENTORY (repeat for each dataset) Dataset and source URL/file: [ ] Capture/survey date and revision: [ ] Coordinate reference, units, height reference and origin: [ ] Accuracy information and missing/estimated fields: [ ] License and permitted sharing: [ ] Transformations and validation point/dimension: [ ] 4. FICTIONAL CHECK EXAMPLE -- DO NOT USE AS PROJECT DATA Site area: 10,000 m2. A: 3 buildings x 1,000 m2 footprint x 4 full floors = 12,000 m2 GFA. B: 2 buildings x 750 m2 footprint x 8 full floors = 12,000 m2 GFA. Both: gross floor area / site area = 1.2. A total footprint: 3,000 m2; remaining site: 7,000 m2. B total footprint: 1,500 m2; remaining site: 8,500 m2. B leaves 1,500 m2 more site outside building footprints. Assumptions: identical full floor plates in each building; no setbacks, voids or excluded areas. Remaining site includes servicing, circulation and other uses; it is not automatically usable green space. Actual area definitions must be checked for the project. These results say nothing about shadow, wind, access or approval without further work. 5. OUR COMPARISON Baseline revision and shared context: [ ] Option A / model revision / dimensions and units: [ ] Option B / model revision / dimensions and units: [ ] Metric / definition / method / A result / B result: [ ] Area reconciliation check and result: [ ] Additional analysis tool, method, version and settings: [ ] Location, date, timezone and environmental assumptions: [ ] Matched camera and lighting identifiers: [ ] Sensitivity to uncertain inputs: [ ] 6. AI AND PRESENTATION RECORD AI feature/tool, version and purpose: [ ] Source model/view and prompt/settings: [ ] Geometry/dimension/retained-object checks: [ ] Illustrative additions and viewer-facing label: [ ] Original model view retained at: [ ] Human review and unresolved differences: [ ] 7. DECISION AND FEEDBACK What the evidence establishes: [ ] What remains uncertain and the next check: [ ] View/object/revision associated with each comment: [ ] Reviewer / date / decision / reason: [ ] Responsible person and next model revision: [ ]